Infrastructure
2023
Feb 2023 | PROPOSED DESIGN AND BUILD CONTRACT FOR T2 CONNECTION CORE & SHELL WORKS AND CONSTRUCTION OF AIRFIELD FACILITIES AT SINGAPORE CHANGI AIRPORT |
2022
Aug 2022 | Major Infrastructure Works at Bedok Town: (A) Drain Widening Cum Cycling Path at Bedok North Street 3; (B) Sewerage Works at Bedok North Road / Bedok North Ave 1 / Bedok North Street 3; (C) Contiguous Bored Pile (CBP) Wall and Drain Reconstruction at Bedok North Road; (D) Road Widening Works at Chai Chee Lane | Feb 2022 | Construction of Polder at Areas A and C of Pulau Tekong | Feb 2022 | Proposed Road, Vehicular Bridge, Bus Shelters and Linkways at Hougang Town (A) Construction of Buangkok Drive (Extension) in Hougang Town (Part 2) (B) Construction of Vehicular Bridge Across Sungei Punggol (C) Construction of Bus Shelters and Linkways at Buangkok Drive (Part 2) |
2021
Jul 2021 | Construction of Tengah Service Reservoir and Ancillary Works | Jul 2021 | Sewerage Scheme to serve Pulau Punggol Barat Contract 4- Proposed Pumping Station at Seletar North Link | Apr 2021 | Dhaka Underground Substation Construction Project at Kawranbazar under DPDC JICA Loan No. BD-P97 | Jan 2021 | Addition and Alteration Works to Existing Air Traffic Control Centre | Jan 2021 | Proposed Construction of (A) DLN Ramp and Associated Facility Buildings and (B) Road Tunnel Linking Bahar to Bulim (Part 1) |
2020
Oct 2020 | Design, Supply, Construction, Installation, Testingand Commissioning of 132/33/11kv UndergroundGrid Substation at Gulshan Including TransmissionLines on Turnkey Basis | Oct 2020 | Proposed Additions and Alterations to an Existing Substation Involving New Erection of a 230KV Substation & Ancillary Facilities on Lot 04754T, MK06 at Upper Jurong Road | Sep 2020 | Bored Pile for BB N4C26, BE C36, WL N5C23 | Jun 2020 | JTC000ETT20300056 Proposed Advance Infrastructure Works at Bulim Phase 2 |
Apr 2020 | Contract CR102 Design and Construction of Tunnels between Aviation Park Station and Depot |
Apr 2020 | Proposed Development of Changi East to Effect 3 Runway Operations at Singapore Changi Airport – Package 1 | Mar 2020 | Contract N101 Design and Construction of North South Corridor (Tunnel) Between ECP and Victoria Street |
Feb 2020 | Construction of Roads, Roadside Drains & Trunk Sewer within Tengah Town (Phase 2); Construction of Common Services Duct within Tengah Town; CE TC | Feb 2020 | Contract J120 Design and Construction of Integrated Transport Hub at Jurong East |
2019
Oct 2019 | Design and Construction of Integrated Train Testing Centre | Oct 2019 | Contract TR243 Construction of Facility Building |
Sep 2019 | Proposed Lift Shafts to Existing Pedestrian Overhead Bridges & Associated Commuter Infrastructure | Jul 2019 | Jurong Port Ready Mixed Concrete Ecosystem | Jun 2019 | Design & Construction of North South Corridor (Viaduct) Between Woodlands Ave 10 and Admiralty Road West | May 2019 | Contract N113 Design and Construction of North South Corridor (Viaduct) Between Yishun Ave 5 and Woodlands Ave 10 |
May 2019 | Construction of Infrastructure Works at Bulim (Phase 1) | Feb 2019 | Contract T316 Construction of Underground Infrastructures |
2018
Nov 2018 | DTSS Phase 2 Contract T-07 – Subcontract Package Measurement | Oct 2018 | Construction of Viaduct and Tunnels for Rapid System (RTS) Link | Aug 2018 | (A) Construction of Punggol Central (West Extension); (B) Civil Engineering Term Contract | Jul 2018 | Earthworks at Lim Chu Kang Area | Jun 2018 | Proposed Development of Changi East to Effect 3 Runway Operations at Singapore Changi Airport | May 2018 | Contract H206 Design and Construction of Bored Tunnels (Package B) and Related HSR Infrastructure Facility in Singapore for KL-Singapore High Speed Rail |
May 2018 | Design and Construction of East-West Transmission Cable Tunnel Contract EW1 | Feb 2018 | Construction of Station, Tunnels and CIQ Building for Rapid Transit Systems (RTS) Link | Jan 2018 | Design and Construction of North-South Corridor (Tunnel) between Ang Mo Kio Ave 3 and Ang Mo Kio Ave 9 |
2017
Dec 2017 | Contract N111 Design and Construction of North South Corridor (Tunnel & Viaduct) Between Ang Mo Kio Ave 9 and SG Seletar |
Oct 2017 | Contract N102 Design and Construction of North-South Corridor (Tunnel) between Victoria Street and Kampong Java Road |
Sep 2017 | Contract N101 Design and Construction of North South Corridor (Tunnel) Between ECP and Victoria Street |
Aug 2017 | Contract N107 Design and Construction of North South Corridor (Tunnel) between Toa Payoh Rise and Marymount Lane |
Jul 2017 | Contract N105 Design and Construction of North-South Corridor (Tunnel) Between Suffolk Walk and Novena Rise |
Jun 2017 | Contract N106 Design and Construction of North South Corridor (Tunnel) Between Novena Rise and Toa Payoh Rise |
May 2017 | Design and Construction of Sewer Tunnels for the Deep Tunnel Sewerage System Phase 2 Project – Contract T-10 & 11 |
Mar 2017 | Rapid P3 A2 @ Pengerang Johor |
Jan 2017 | Design and Construction of Sewer Tunnels for the Deep Tunnel Sewerage System Phase 2 Project – Contract T-08 & 09 |
2016
Mar 2016 | Project Sling External Work | Mar 2016 | Proposed Underground Pedestrian On Lots 00336p, 00337t & 00340t Ts02 Walkway From The 38-Storey Office Development Connecting To Existing Underground Pedestrian Walkway At Cecil Street/Telok Ayer Street (Downtown Core Planning Area) |
2015
Dec 2015 | PROJECT D2014-00169 C01 – LAND PREPARATION, AIRFIELD AND ANCILLARY WORKS AT CHANGI EAST | Aug 2015 | Baleh Hydroelectric Project | Apr 2015 | Proposed Ulu Pandan Bus Depot |
2013
Oct 2013 | Construction of Roads, Drains and Sewers at Bukit Batok N4 Phase 2 |
Jul 2013 | ABC Waters Project Along Sungei Ulu Pandan and Sungei Pandan |
Jun 2013 | Tender No TC130113 Design and Construction of Jurong Island to Pioneer Transmission Cable Tunnel |
Apr 2013 | Proposed Flyover at West Coast Highway Across Jalan Buroh |
Apr 2013 | Upgrading of Infrastructure Works at Raffles Marina, Tuas, Singapore |
2011
Dec 2011 | RFQ for Cable Tunnel Contract |
Oct 2011 | RFQ for Cable Tunnel Contract |
Oct 2011 | C488 – Construction of At-Grade Road System at Marina South |
Oct 2011 | Construction of Vehicular Underpass at Nicoll Highway/ Guillemard Road Junction |
Jun 2011 | Expansion of CTE/TPE/SLE Interchange, Contract ER391 Expansion of CTE/TPE/SLE Interchange |
2010
Nov 2010 | Civil and Track Works for A & A Works at Bishan and Ulu Pandan Depots |
Feb 2010 | Proposed Common Services Tunnel (CST) Phase 3B at Downtown Marina Bay (MC02) |
2009
Nov 2009 | Proposed Common Services Tunnel (CST) Phase 3B At Downtown Marina Bay (MC01) |
Jul 2009 | Development of Infrastructure and Facilities at Seletar |