Infrastructure

Infrastructure

2019
Oct 2019 Design and Construction of Integrated Train Testing Centre
Oct 2019 Contract TR243
Construction of Facility Building
Sep 2019 Proposed Lift Shafts to Existing Pedestrian Overhead Bridges & Associated Commuter Infrastructure
Jul 2019 Jurong Port Ready Mixed Concrete Ecosystem
Jun 2019 Design & Construction of North South Corridor (Viaduct) Between Woodlands Ave 10 and Admiralty Road West
May 2019 Contract N113
Design and Construction of North South Corridor (Viaduct) Between Yishun Ave 5 and Woodlands Ave 10
May 2019 Construction of Infrastructure Works at Bulim (Phase 1)
Feb 2019 Contract T316
Construction of Underground Infrastructures
2018
Nov 2018 DTSS Phase 2 Contract T-07 – Subcontract Package Measurement
Oct 2018 Construction of Viaduct and Tunnels for Rapid System (RTS) Link
Aug 2018 (A) Construction of Punggol Central (West Extension); (B) Civil Engineering Term Contract
Jul 2018 Earthworks at Lim Chu Kang Area
Jun 2018 Proposed Development of Changi East to Effect 3 Runway Operations at Singapore Changi Airport
May 2018 Contract H206
Design and Construction of Bored Tunnels (Package B) and Related HSR Infrastructure Facility in Singapore for KL-Singapore High Speed Rail
May 2018 Design and Construction of East-West Transmission Cable Tunnel Contract EW1
Feb 2018 Construction of Station, Tunnels and CIQ Building for Rapid Transit Systems (RTS) Link
Jan 2018 Design and Construction of North-South Corridor (Tunnel) between Ang Mo Kio Ave 3 and Ang Mo Kio Ave 9
2017
Dec 2017 Contract N111
Design and Construction of North South Corridor (Tunnel & Viaduct) Between Ang Mo Kio Ave 9 and SG Seletar
Oct 2017 Contract N102
Design and Construction of North-South Corridor (Tunnel) between Victoria Street and Kampong Java Road
Sep 2017 Contract N101
Design and Construction of North South Corridor (Tunnel) Between ECP and Victoria Street
Aug 2017 Contract N107
Design and Construction of North South Corridor (Tunnel) between Toa Payoh Rise and Marymount Lane
Jul 2017 Contract N105
Design and Construction of North-South Corridor (Tunnel) Between Suffolk Walk and Novena Rise
Jun 2017 Contract N106
Design and Construction of North South Corridor (Tunnel) Between Novena Rise and Toa Payoh Rise
May 2017 Design and Construction of Sewer Tunnels for the Deep Tunnel Sewerage System Phase 2 Project – Contract T-10 & 11
Mar 2017 Rapid P3 A2 @ Pengerang Johor
Jan 2017 Design and Construction of Sewer Tunnels for the Deep Tunnel Sewerage System Phase 2 Project – Contract T-08 & 09
2016
Mar 2016 Project Sling External Work
Mar 2016 Proposed Underground Pedestrian On Lots 00336p, 00337t & 00340t Ts02 Walkway From The 38-Storey Office Development Connecting To Existing Underground Pedestrian Walkway At Cecil Street/Telok Ayer Street (Downtown Core Planning Area)
2015
Dec 2015 PROJECT D2014-00169 C01 – LAND PREPARATION, AIRFIELD AND ANCILLARY WORKS AT CHANGI EAST
Aug 2015 Baleh Hydroelectric Project
Apr 2015 Proposed Ulu Pandan Bus Depot
2013
Oct 2013 Construction of Roads, Drains and Sewers at Bukit Batok N4 Phase 2
Jul 2013 ABC Waters Project Along Sungei Ulu Pandan and Sungei Pandan
Jun 2013 Tender No TC130113
Design and Construction of Jurong Island to Pioneer Transmission Cable Tunnel
Apr 2013 Proposed Flyover at West Coast Highway Across Jalan Buroh
Apr 2013 Upgrading of Infrastructure Works at Raffles Marina, Tuas, Singapore
2011
Dec 2011 RFQ for Cable Tunnel Contract
Oct 2011 RFQ for Cable Tunnel Contract
Oct 2011 C488 – Construction of At-Grade Road System at Marina South
Oct 2011 Construction of Vehicular Underpass at Nicoll Highway/ Guillemard Road Junction
Jun 2011 Expansion of CTE/TPE/SLE Interchange, Contract ER391 Expansion of CTE/TPE/SLE Interchange
2010
Nov 2010 Civil and Track Works for A & A Works at Bishan and Ulu Pandan Depots
Feb 2010 Proposed Common Services Tunnel (CST) Phase 3B at Downtown Marina Bay (MC02)
2009
Nov 2009 Proposed Common Services Tunnel (CST) Phase 3B At Downtown Marina Bay (MC01)
Jul 2009 Development of Infrastructure and Facilities at Seletar